Skip to content
ÖffiGo
ÖffiGo
Stop · StyriaData through: 26 November 2026

Arnfels Hauptplatz

Punctuality of the lines at this stop, last 30 days.

85.5 %
on time
at most 1 min early, 3 min late
0.2 min
avg. delay
last 30 days
3
lines measured
last 30 days
743
measurements
last 30 days

Linesavg. delay per stop, last 30 days

LineDirectionOn timeAvg minMeasured
730BusLeibnitz Tennishalle/HAK · avg 0.2 min · 250 measuredLeibnitz Tennishalle/HAK98 %0.2250
780BusEhrenhausen Bf · avg 1.0 min · 182 measuredEhrenhausen Bf90 %1.0182
780BusArnfels Hauptplatz · avg -0.8 min · 86 measuredArnfels Hauptplatz62 %-0.886
730BusArnfels Berufsschule · avg -1.0 min · 54 measuredArnfels Berufsschule59 %-1.054
785BusEibiswald Mittelschule · avg 0.2 min · 54 measuredEibiswald Mittelschule98 %0.254
785BusEibiswald Kreuzkirche · avg 0.1 min · 49 measuredEibiswald Kreuzkirche96 %0.149
785BusArnfels Hauptplatz · avg -1.3 min · 36 measuredArnfels Hauptplatz44 %-1.336
730BusLeibnitz Bf · avg 4.3 min · 13 measuredLeibnitz Bf92 %4.313
780BusLeutschach Schulen · avg 1.9 min · 11 measuredLeutschach Schulen73 %1.911
785BusEibiswald Kreuzkirche · avg 0.0 min · 4 measuredEibiswald Kreuzkirche100 %0.04
785BusEibiswald Mittelschule · avg 0.0 min · 2 measuredEibiswald Mittelschule100 %0.02
730BusLeibnitz Wagnastraße/Schulzentrum · avg 28.8 min · 1 measuredLeibnitz Wagnastraße/Schulzentrum0 %28.81
780BusEhrenhausen Bf · avg 0.0 min · 1 measuredEhrenhausen Bf100 %0.01

Data sources: Vienna — City of Vienna, data.wien.gv.at (CC BY 4.0). Styria — open real-time data (GTFS-RT and TRIAS OGD); data source: Mobilitätsverbünde Österreich OG – data.mobilitaetsverbuende.at. Rail — ÖBB-Infrastruktur AG and ÖBB-Personenverkehr AG (CC BY 4.0). Analysis: ÖffiGo, not an official statistic.