Skip to content
ÖffiGo
ÖffiGo
Stop · StyriaData through: 26 November 2026

Lafnitz Gemeindezentrum

Punctuality of the lines at this stop, last 30 days.

72.0 %
on time
at most 1 min early, 3 min late
2.1 min
avg. delay
last 30 days
5
lines measured
last 30 days
981
measurements
last 30 days

Linesavg. delay per stop, last 30 days

LineDirectionOn timeAvg minMeasured
311BusGleisdorf Busbahnhof · avg 5.0 min · 137 measuredGleisdorf Busbahnhof42 %5.0137
311BusWien Karlsplatz · avg 2.1 min · 127 measuredWien Karlsplatz67 %2.1127
301BusHaideggendorf Blumensiedlung (B63) · avg 2.3 min · 118 measuredHaideggendorf Blumensiedlung (B63)66 %2.3118
324BusVorau Stift · avg 1.2 min · 101 measuredVorau Stift80 %1.2101
304BusHartberg Busbahnhof · avg 1.6 min · 95 measuredHartberg Busbahnhof84 %1.695
324BusHartberg Erlenstraße · avg 1.4 min · 86 measuredHartberg Erlenstraße90 %1.486
301BusHartberg Bf · avg 1.1 min · 78 measuredHartberg Bf87 %1.178
304BusBad Tatzmannsdorf Joseph-Haydn-Platz · avg 1.3 min · 74 measuredBad Tatzmannsdorf Joseph-Haydn-Platz78 %1.374
314BusWenigzell Gemeindeamt · avg 3.2 min · 71 measuredWenigzell Gemeindeamt61 %3.271
314BusHartberg Erlenstraße · avg 0.6 min · 61 measuredHartberg Erlenstraße80 %0.661
304BusRohrbach-Vorau Bf · avg 0.5 min · 30 measuredRohrbach-Vorau Bf90 %0.530
304BusPinkafeld Marktplatz · avg 1.5 min · 2 measuredPinkafeld Marktplatz100 %1.52
304BusOberschützen Hauptplatz · avg 13.1 min · 1 measuredOberschützen Hauptplatz0 %13.11

Data sources: Vienna — City of Vienna, data.wien.gv.at (CC BY 4.0). Styria — open real-time data (GTFS-RT and TRIAS OGD); data source: Mobilitätsverbünde Österreich OG – data.mobilitaetsverbuende.at. Rail — ÖBB-Infrastruktur AG and ÖBB-Personenverkehr AG (CC BY 4.0). Analysis: ÖffiGo, not an official statistic.